• Users Online: 2762
  • Print this page
  • Email this page
BRIEF COMMUNICATION
Year : 2018  |  Volume : 26  |  Issue : 1  |  Page : 42-44

Failure analysis for ultrasound machines in a radiology department after implementation of predictive maintenance method


Department of Radiology, Queen Mary Hospital, Hong Kong, China

Correspondence Address:
Dr. Martin Law
Department of Radiology, Queen Mary Hospital, 102 Pokfulam Road, Hong Kong
China
Login to access the Email id

Source of Support: None, Conflict of Interest: None


DOI: 10.4103/JMU.JMU_13_18

Rights and Permissions

Objective: The objective of the study was to perform quantitative failure and fault analysis to the diagnostic ultrasound (US) scanners in a radiology department after the implementation of the predictive maintenance (PdM) method; to study the reduction trend of machine failure; to understand machine operating parameters affecting the failure; to further optimize the method to maximize the machine clinically service time. Materials and Methods: The PdM method has been implemented to the 5 US machines since 2013. Log books were used to record machine failures and their root causes together with the time spent on repair, all of which were retrieved, categorized, and analyzed for the period between 2013 and 2016. Results: There were a total of 108 cases of failure occurred in these 5 US machines during the 4-year study period. The average number of failure per month for all these machines was 2.4. Failure analysis showed that there were 33 cases (30.5%) due to software, 44 cases (40.7%) due to hardware, and 31 cases (28.7%) due to US probe. There was a statistically significant negative correlation between the time spent on regular quality assurance (QA) by hospital physicists with the time spent on faulty parts replacement over the study period (P = 0.007). However, there was no statistically significant correlation between regular QA time and total yearly breakdown case (P = 0.12), although there has been a decreasing trend observed in the yearly total breakdown. Conclusion: There has been a significant improvement on the machine failure of US machines attributed to the concerted effort of sonographers and physicists in our department to practice the PdM method, in that system component repair time has been reduced, and a decreasing trend in the number of system breakdown has been observed.


[FULL TEXT] [PDF]*
Print this article     Email this article
 Next article
 Previous article
 Table of Contents

 Similar in PUBMED
   Search Pubmed for
   Search in Google Scholar for
 Related articles
 Citation Manager
 Access Statistics
 Reader Comments
 Email Alert *
 Add to My List *
 * Requires registration (Free)
 

 Article Access Statistics
    Viewed5821    
    Printed282    
    Emailed0    
    PDF Downloaded517    
    Comments [Add]    

Recommend this journal